Mas Maya Interior Floors

Mas Maya Coating is perfect for interior floors due to its robust, durable finish, which is free from VOCs and chemicals, ensuring a healthier indoor environment. It adheres well to surfaces like tiles and wood, providing long-lasting protection. Moreover, it helps maintain a comfortable indoor climate by regulating humidity, while delivering a smooth, elegant finish that elevates any space.

What You'll Need

How Much You'll Need

Floor Size (m²) Coating (10kg Bags) Primer (5L) Presealer (5L) Onecoat (6L)
10 m² 6 bags 1 bottle 1 bottle 1 pack (1.2L)
25 m² 15 bags 1 bottle 1 bottle 1 pack
50 m² 29 bags 1 bottle 2 bottles 2 packs
100 m² 57 bags 2 bottles 3 bottles 3 packs
150 m² 86 bags 3 bottles 4 bottles 4 packs
200 m² 114 bags 4 bottles 5 bottles 5 packs
250 m² 143 bags 5 bottles 6 bottles 6 packs
300 m² 171 bags 6 bottles 7 bottles 7 packs
400 m² 229 bags 8 bottles 9 bottles 9 packs
500 m² 286 bags 10 bottles 12 bottles 11 packs
600 m² 343 bags 12 bottles 14 bottles 13 packs
800 m² 457 bags 16 bottles 19 bottles 17 packs
1000 m² 571 bags 20 bottles 24 bottles 22 packs

Installation Guide

1. Surface Preparation

  • Clean the Surface: Ensure the surface is clean, dry, and free from dust, dirt, and any loose materials.
  • Repair Imperfections: Fill in any cracks or holes with Mas Maya Base.
  • Apply Primer: Use Mas Maya Primer to improve adhesion. Apply evenly with a brush or roller and let it dry according to the manufacturer's instructions.

2. Mixing the Plaster

  • Mixing Ratio: Combine Mas Maya Coating powder with clean water at a ratio of ⅓ liter of water per kilogram of powder.
  • Mixing Process: Mix thoroughly using a mechanical drill with a mixing paddle. Let it rest for 5 minutes, then stir again until the consistency is similar to yogurt.

3. Application of the First Coat

  • Apply First Coat: Using a steel trowel, spread a thin, even layer of 2 mm across the entire floor. Maintain the trowel at a shallow angle (15-30 degrees) to ensure even coverage.
  • Drying: Let the first coat dry overnight, ensuring the area is free from foot traffic during this time.

4. Application of the Second Coat

  • Dampen the Surface: Lightly mist the floor with water to extend the plaster's working time.
  • Apply Second Coat: Apply the second layer similarly to the first, using overlapping strokes to achieve a smooth, even finish. For a textured effect, vary your trowel strokes slightly.
  • Burnishing: Once the second coat is partially dry but still workable, use a clean steel trowel to compress and smooth the surface, creating a polished, seamless finish.

5. Finishing Touches

  • Sanding: After the plaster has fully dried, sand the floor with 200-400 grit sandpaper to achieve the desired smoothness.
  • Cleaning: Thoroughly clean the floor to remove any dust or debris from sanding.

6. Sealing the Surface

  • Apply Presealer: To protect the plaster and ensure durability, apply two coats of Topciment Presealer. Allow each coat to dry for 4 hours before applying the next.
  • Apply TopSealer Onecoat: Once the Presealer has dried (wait at least 12 hours), apply two coats of TopSealer Onecoat. Allow 8-24 hours of drying time between coats. For high-traffic areas, apply an additional coat of TopSealer 100 after the Onecoat for maximum durability.