light-sand-mas-maya-plaster_d1661f29-07cc-48f2-ab86-6c14b5bfac3e.jpg

Mas Maya Interior Walls

Mas Maya Coating is ideal for interior walls due to its natural, breathable finish, free from VOCs and chemicals, promoting a healthier indoor environment. It can be applied to various surfaces like tiles and wood, ensuring durability. Additionally, it helps regulate indoor humidity, and provides a smooth, elegant finish that enhances any space.

What You'll Need

How Much You'll Need

Wall Size (m²) Coating (10kg Bags) Primer (5L) Onecoat (6L)
10 m² 6 bags 1 bottle 1 pack (1.2L)
25 m² 15 bags 1 bottle 1 pack
50 m² 29 bags 1 bottle 2 packs
100 m² 57 bags 2 bottles 3 packs
150 m² 86 bags 3 bottles 4 packs
200 m² 114 bags 4 bottles 5 packs
250 m² 143 bags 5 bottles 6 packs
300 m² 171 bags 6 bottles 7 packs
400 m² 229 bags 8 bottles 9 packs
500 m² 286 bags 10 bottles 11 packs
600 m² 343 bags 12 bottles 13 packs
800 m² 457 bags 16 bottles 17 packs
1000 m² 571 bags 20 bottles 22 packs

Installation Guide

1. Surface Preparation

  • Clean the Surface: Ensure the wall is clean, dry, and free from dust, dirt, and any loose materials.
  • Repair Imperfections: Fill in any cracks or holes with Mas Maya Base.
  • Apply Primer: Use Mas Maya Primer to improve adhesion. Apply evenly with a brush or roller and let it dry according to the manufacturer's instructions.

2. Mixing the Plaster

  • Mixing Ratio: Combine Mas Maya Coating powder with clean water at a ratio of ⅓ liter of water per kilogram of powder.
  • Mixing Process: Mix thoroughly using a mechanical drill with a mixing paddle. Let it rest for 5 minutes, then stir again until the consistency is similar to yogurt.

3. Application of the First Coat

  • Apply First Coat: Using a steel trowel, apply a thin, even layer of 2 mm across the entire wall. Hold the trowel at a shallow angle (15-30 degrees) for the best results.
  • Drying: Allow the first coat to dry overnight, avoiding direct sunlight on the surface.

4. Application of the Second Coat

  • Dampen the Surface: Lightly mist the wall with water to extend the working time of the plaster.
  • Apply Second Coat: Apply the second layer similarly to the first but vary your trowel strokes for a more textured finish. Use overlapping, multidirectional strokes to create an organic, cloudy effect if desired.
  • Burnishing: Once the second coat is partially dry but still slightly pliable, use a clean steel trowel to compress and smooth the surface. This creates the polished, marbled appearance typical of Mas Maya.

5. Finishing Touches

  • Sanding: After the plaster has fully dried, lightly sand the surface with 200-400 grit sandpaper to achieve a smooth, polished finish.
  • Cleaning: Wipe down the surface with a clean, dry cloth to remove any dust from sanding.

6. Optional Sealing

  • Apply TopSealer Onecoat (Optional): For added durability and moisture resistance, apply two coats of TopSealer Onecoat. Allow the first coat to dry for 8-24 hours before applying the second. This is highly recommended in areas prone to moisture or frequent cleaning.

Tips for Success:

  • Work in Sections: Divide the wall into smaller sections to avoid the plaster drying too quickly and to prevent visible seams.
  • Practice: If new to applying plaster, practice on a spare board before working on your walls.
  • Environmental Conditions: Avoid applying the coating in direct sunlight or extreme temperatures. Ideal conditions are moderate temperature and humidity.

Product Title€99,00

Our sample plaques are perfect for getting a feel of Mas Maya and finding the ideal colour for your project.