Chukum1.jpg

Mas Maya Pools

Mas Maya Coating is ideal for pools, offering a water-resistant, durable finish that withstands constant exposure to water. Free from VOCs, it ensures a safe environment. The coating adheres strongly to surfaces like concrete, providing long-lasting protection. It also prevents moisture issues, delivering a smooth, elegant finish that enhances the pool's appearance.

What You'll Need

How Much You'll Need

Area Size
(m²)
Coating
(10kg Bags)
Pool Primer Mesh (m²) Pool Sealer
10 m² 3 bags 2x 1L bottles 10 m² 2x 1L bottles
25 m² 8 bags 3x 1L bottles 25 m² 3x 1L bottles
50 m² 15 bags 1x 5L bottle 50 m² 1x 5L bottle
100 m² 29 bags 2x 5L bottles 100 m² 2x 5L bottles
150 m² 43 bags 3x 5L bottles 150 m² 3x 5L bottles
200 m² 58 bags 4x 5L bottles 200 m² 4x 5L bottles
250 m² 72 bags 5x 5L bottles 250 m² 5x 5L bottles
300 m² 86 bags 6x 5L bottles 300 m² 6x 5L bottles

Installation Guide

1. Surface Preparation

  • Repair imperfections: Fill any cracks, gaps, or holes and smooth the surface, including
    filling grout lines between tiles. Ensure the surface is flat and smooth before moving
    on.
  • For Wet Areas: In areas regularly exposed to water (e.g. pools etc.) ensure that the waterproof membrane is intact before applying Mas Maya Coating.
  • Apply Primer: Use Mas Maya Pool Primer to improve adhesion.
  • Apply Mesh: Lay Mas Maya Mesh on top of the Primer. Allow 30 minutes to partly dry.

2. Mix the Mas Maya Coating

  • Optional Pigment: If adding colour pigment, mix it evenly into the water before combining with the coating powder.
  • Mix Water and Coating: Add 1/3 liter of clean water for every kilogram of Mas Maya Coating powder.
  • Mixing Process: Stir the mixture by hand or with a mechanical drill until smooth and consistent, resembling yogurt. Allow the mixture to rest for 15 minutes, then give it a final stir.

3. Application Process

First Layer:

  • Trowel Application: Use a steel trowel to apply a thin layer (~2 mm) across the surface, holding the trowel at a shallow angle (15-30°).
  • Mesh: If applying on top of Mas Maya Mesh, ensure the first layer completely covers the Mesh.

Second Layer:

  • Drying Time: Allow the first layer to dry until it is set but still slightly damp to the touch. This typically takes a few hours, depending on the climate.
  • Optional Water Mist: Lightly mist the surface with water to extend working time if needed.
  • Trowel Application: Apply the second coat with slightly overlapping strokes at different angles for a more organic finish.

Burnishing:

  • When to Burnish: Begin burnishing when the second coat is partially dry but still pliable.
  • Process: Lightly spray the material with water and rework it while applying pressure using a clean trowel. This will help create a smooth, polished finish.
  • Final Drying: Allow the material to dry overnight.

4. Finishing

  • Sanding: Use an orbital sander or fine-grit sandpaper (around 200 grain) to smooth and polish the surface.
  • Cleaning: Wipe down the surface to remove any dust.
  • Apply Pool Sealer: Use two coats of Mas Maya Pool Sealer waiting 4 hours between coats.
  • Fill the Pool: The surface will be touch-dry in approximately 3 hours. Ensure the surface is completely dry before adding water to the pool.

Coating Sample Plaque€5,00

Our sample plaques are perfect for getting a feel of Mas Maya and finding the ideal colour for your project.