Mas Maya Coating is perfect for interior floors due to its robust, durable finish, which is free from VOCs and chemicals, ensuring a healthier indoor environment. It adheres well to surfaces like tiles and wood, providing long-lasting protection. Moreover, it helps maintain a comfortable indoor climate by regulating humidity, while delivering a smooth, elegant finish that elevates any space.
What You'll Need
- Mas Maya Coating
- Mas Maya Primer
- Mas Maya Base (if your surface isn't yet flat and smooth)
- Topciment Presealer
- TopSealer OneCoat
- Steel trowels (various sizes)
- Sandpaper (200-400 grit)
- Clean buckets and sponges
- Painter's tape
- Spray bottle with water
How Much You'll Need
Floor Size (m²) | Coating (10kg Bags) | Primer (5L) | Presealer (5L) | Onecoat (6L) |
---|---|---|---|---|
10 m² | 6 bags | 1 bottle | 1 bottle | 1 pack (1.2L) |
25 m² | 15 bags | 1 bottle | 1 bottle | 1 pack |
50 m² | 29 bags | 1 bottle | 2 bottles | 2 packs |
100 m² | 57 bags | 2 bottles | 3 bottles | 3 packs |
150 m² | 86 bags | 3 bottles | 4 bottles | 4 packs |
200 m² | 114 bags | 4 bottles | 5 bottles | 5 packs |
250 m² | 143 bags | 5 bottles | 6 bottles | 6 packs |
300 m² | 171 bags | 6 bottles | 7 bottles | 7 packs |
400 m² | 229 bags | 8 bottles | 9 bottles | 9 packs |
500 m² | 286 bags | 10 bottles | 12 bottles | 11 packs |
600 m² | 343 bags | 12 bottles | 14 bottles | 13 packs |
800 m² | 457 bags | 16 bottles | 19 bottles | 17 packs |
1000 m² | 571 bags | 20 bottles | 24 bottles | 22 packs |
Installation Guide
1. Surface Preparation
- Clean the Surface: Ensure the surface is clean, dry, and free from dust, dirt, and any loose materials.
- Repair Imperfections: Fill in any cracks or holes with Mas Maya Base.
- Apply Primer: Use Mas Maya Primer to improve adhesion. Apply evenly with a brush or roller and let it dry according to the manufacturer's instructions.
2. Mixing the Plaster
- Mixing Ratio: Combine Mas Maya Coating powder with clean water at a ratio of ⅓ liter of water per kilogram of powder.
- Mixing Process: Mix thoroughly using a mechanical drill with a mixing paddle. Let it rest for 5 minutes, then stir again until the consistency is similar to yogurt.
3. Application of the First Coat
- Apply First Coat: Using a steel trowel, spread a thin, even layer of 2 mm across the entire floor. Maintain the trowel at a shallow angle (15-30 degrees) to ensure even coverage.
- Drying: Let the first coat dry overnight, ensuring the area is free from foot traffic during this time.
4. Application of the Second Coat
- Dampen the Surface: Lightly mist the floor with water to extend the plaster's working time.
- Apply Second Coat: Apply the second layer similarly to the first, using overlapping strokes to achieve a smooth, even finish. For a textured effect, vary your trowel strokes slightly.
- Burnishing: Once the second coat is partially dry but still workable, use a clean steel trowel to compress and smooth the surface, creating a polished, seamless finish.
5. Finishing Touches
- Sanding: After the plaster has fully dried, sand the floor with 200-400 grit sandpaper to achieve the desired smoothness.
- Cleaning: Thoroughly clean the floor to remove any dust or debris from sanding.
6. Sealing the Surface
- Apply Presealer: To protect the plaster and ensure durability, apply two coats of Topciment Presealer. Allow each coat to dry for 4 hours before applying the next.
- Apply TopSealer Onecoat: Once the Presealer has dried (wait at least 12 hours), apply two coats of TopSealer Onecoat. Allow 8-24 hours of drying time between coats. For high-traffic areas, apply an additional coat of TopSealer 100 after the Onecoat for maximum durability.
Our sample plaques are perfect for getting a feel of Mas Maya and finding the ideal colour for your project.