IMG_6867.jpg

Mas Maya Kitchens

Mas Maya Coating is perfect for kitchens, providing a durable, easy-to-clean finish that withstands moisture and spills. Free from VOCs, it ensures a healthy environment. The coating bonds well to surfaces like tiles and wood, offering long-lasting protection, while adding a smooth, elegant finish that enhances the kitchen's design.

What You'll Need

How Much You'll Need

Area Size
(m²)
Coating
(10kg Bags)
Primer Mesh (m²) Presealer Sealer Heavy-Duty Sealer (Optional)
10 m² 3 bags 1x 1L bottle 10 m² 1x 1L bottle 1x 1L bottle 1x 1.5L bottle
25 m² 8 bags 3x 1L bottles 25 m² 3x 1L bottles 3x 1L bottles 2x 1.5L bottles
50 m² 15 bags 1x 5L bottle 50 m² 1x 5L bottle 1x 5L bottle 5x 1.5L bottles
100 m² 29 bags 2x 5L bottles 100 m² 2x 5L bottles 2x 5L bottles 10x 1.5L bottles
150 m² 43 bags 3x 5L bottles 150 m² 3x 5L bottles 3x 5L bottles 15x 1.5L bottles
200 m² 58 bags 4x 5L bottles 200 m² 4x 5L bottles 4x 5L bottles 20x 1.5L bottles
250 m² 72 bags 5x 5L bottles 250 m² 5x 5L bottles 5x 5L bottles 25x 1.5L bottles
300 m² 86 bags 6x 5L bottles 300 m² 6x 5L bottles 6x 5L bottles 30x 1.5L bottles

Installation Guide

1. Surface Preparation

  • Repair imperfections: Fill any cracks, gaps, or holes and smooth the surface, including
    filling grout lines between tiles. Ensure the surface is flat and smooth before moving
    on.
  • For Wet Areas: In areas regularly exposed to water (e.g. water basins etc.) ensure that the waterproof membrane is intact before applying Mas Maya Coating.
  • Apply Primer: Use Mas Maya Primer to improve adhesion.
  • Apply Mesh: If applying to floors, tiles, wood, plastic or crumbling surfaces, lay Mas Maya Mesh on top of the Primer. Allow 30 minutes to partly dry.

2. Mix the Mas Maya Coating

  • Optional Pigment: If adding colour pigment, mix it evenly into the water before combining with the coating powder.
  • Mix Water and Coating: Add 1/3 liter of clean water for every kilogram of Mas Maya Coating powder.
  • Mixing Process: Stir the mixture by hand or with a mechanical drill until smooth and consistent, resembling yogurt. Allow the mixture to rest for 15 minutes, then give it a final stir.

3. Application Process

First Layer:

  • Trowel Application: Use a steel trowel to apply a thin layer (~2 mm) across the surface, holding the trowel at a shallow angle (15-30°).
  • Mesh: If applying on top of Mas Maya Mesh (e.g. for Floors or Tiles), ensure the first layer completely covers the Mesh.

Second Layer:

  • Drying Time: Allow the first layer to dry until it is set but still slightly damp to the touch. This typically takes a few hours, depending on the climate.
  • Optional Water Mist: Lightly mist the surface with water to extend working time if needed.
  • Trowel Application: Apply the second coat with slightly overlapping strokes at different angles for a more organic finish.

Burnishing:

  • When to Burnish: Begin burnishing when the second coat is partially dry but still pliable.
  • Process: Lightly spray the material with water and rework it while applying pressure using a clean trowel. This will help create a smooth, polished finish.
  • Final Drying: Allow the material to dry overnight.

4. Finishing

  • Sanding: Use an orbital sander or fine-grit sandpaper (around 200 grain) to smooth and polish the surface.
  • Cleaning: Wipe down the surface to remove any dust.
  • Apply Presealer: Use two coats of Mas Maya Presealer, waiting 4 hours between coats.
  • Apply Sealer: After 12 hours, apply two coats of Mas Maya Sealer with a short-hair roller.
  • Apply Heavy-Duty Sealer (Optional): For maximum durability in kitchen, especially on high-use areas like wash basins, floors, and kitchen worktops, apply an additional two coats of Mas Maya Heavy-Duty Sealer.

Mas Maya Coating (Placa de Amostra de Revestimento)€5,00

Our sample plaques are perfect for getting a feel of Mas Maya and finding the ideal colour for your project.