Chukum_Tulum.jpg

Mas Maya Exterior Walls

Mas Maya Coating offers a durable, natural finish for exterior walls. Its breathable, weather-resistant formula protects against the elements while maintaining an elegant appearance. Suitable for various surfaces like brick and wood, Mas Maya ensures strong adhesion, preventing cracks and peeling. Elevate your outdoor spaces with this versatile, eco-friendly coating.

What You'll Need

How Much You'll Need

Wall Size (m²) Coating (10kg Bags) Primer (5L) Onecoat (6L)
10 m² 6 bags 1 bottle 1 pack (1.2L)
25 m² 15 bags 1 bottle 1 pack
50 m² 29 bags 1 bottle 2 packs
100 m² 57 bags 2 bottles 3 packs
150 m² 86 bags 3 bottles 4 packs
200 m² 114 bags 4 bottles 5 packs
250 m² 143 bags 5 bottles 6 packs
300 m² 171 bags 6 bottles 7 packs
400 m² 229 bags 8 bottles 9 packs
500 m² 286 bags 10 bottles 11 packs
600 m² 343 bags 12 bottles 13 packs
800 m² 457 bags 16 bottles 17 packs
1000 m² 571 bags 20 bottles 22 packs

Installation Guide

1. Surface Preparation

  • Clean the Surface: Ensure the wall is clean, dry, and free from dust, dirt, and any loose materials.
  • Repair Imperfections: Fill in any cracks or holes with Mas Maya Base.
  • Apply Primer: Use Mas Maya Primer to improve adhesion. Apply evenly with a brush or roller and let it dry according to the manufacturer's instructions.

2. Mixing the Plaster

  • Mixing Ratio: Combine Mas Maya Coating powder with clean water at a ratio of ⅓ liter of water per kilogram of powder.
  • Mixing Process: Mix thoroughly using a mechanical drill with a mixing paddle. Let it rest for 5 minutes, then stir again until the consistency is similar to yogurt.

3. Application of the First Coat

  • Apply First Coat: Using a steel trowel, apply a thin, even layer of 2 mm across the entire wall. Hold the trowel at a shallow angle (15-30 degrees) for the best results.
  • Drying: Allow the first coat to dry overnight, avoiding direct sunlight on the surface.

4. Application of the Second Coat

  • Dampen the Surface: Lightly mist the wall with water to extend the working time of the plaster.
  • Apply Second Coat: Apply the second layer similarly to the first but vary your trowel strokes for a more textured finish. Use overlapping, multidirectional strokes to create an organic, cloudy effect if desired.
  • Burnishing: Once the second coat is partially dry but still slightly pliable, use a clean steel trowel to compress and smooth the surface. This creates the polished, marbled appearance typical of Mas Maya.

5. Finishing Touches

  • Sanding: After the plaster has fully dried, lightly sand the surface with 200-400 grit sandpaper to achieve a smooth, polished finish.
  • Cleaning: Wipe down the surface with a clean, dry cloth to remove any dust from sanding.

6. Optional Sealing

  • Apply TopSealer Onecoat (Optional): For added durability and moisture resistance, apply two coats of TopSealer Onecoat. Allow the first coat to dry for 8-24 hours before applying the second. This is highly recommended in areas prone to moisture or frequent cleaning.

Tips for Success:

  • Work in Sections: Divide the wall into smaller sections to avoid the plaster drying too quickly and to prevent visible seams.
  • Practice: If new to applying plaster, practice on a spare board before working on your walls.
  • Environmental Conditions: Avoid applying the coating in direct sunlight or extreme temperatures. Ideal conditions are moderate temperature and humidity.

Título do produto€99,00

Our sample plaques are perfect for getting a feel of Mas Maya and finding the ideal colour for your project.